PM Surya Ghar Muft Bijli Yojana (2026): Exact Subsidy Slabs, Sizing & ROI in Gujarat
By Pankaj Gupta — Lead Solar Systems Engineer, Renewix Innovations

1. Direct Central Financial Assistance (CFA) Slabs
Under the PM Surya Ghar Muft Bijli Yojana, central government subsidy applies strictly to grid-tied residential rooftop installations built using DCR (Domestic Content Requirement) solar modules by a registered vendor.
The subsidy is calculated per kW of installed PV capacity (or sanctioned load limit where applicable) and credited directly to the consumer's bank account via DBT within ~30 days post DISCOM commissioning.
- 1 kW Residential System: ₹30,000 central subsidy (generates ~120–135 units/month in Gujarat)
- 2 kW Residential System: ₹60,000 central subsidy (generates ~240–270 units/month)
- 3 kW to 10 kW Residential System: ₹78,000 maximum subsidy cap (generates ~360–1,350 units/month)
- Housing Society / RWA Common Load: ₹18,000 per kW (capped at 500 kW total @ 3 kW per flat)
2. Step-by-Step Commissioning Workflow
DISCOM net-metering approval across DGVCL, MGVCL, UGVCL, PGVCL, and Torrent Power follows a standardized national portal sequence.
- Step 1: Register consumer number on the national PM Surya Ghar portal & apply for Technical Feasibility Approval (TFA).
- Step 2: Select an empanelled EPC engineer such as Renewix Innovations to finalize shadow-free layout and Single Line Diagram (SLD).
- Step 3: Install DCR N-Type TOPCon modules, CEA-compliant earthing (IS 3043), SPD protection, and inverter.
- Step 4: Submit installation details for DISCOM inspection & bi-directional net meter installation.
- Step 5: Download Commissioning Certificate and receive DBT subsidy within 30 days.
| Plant Size | Est. Monthly Gen. | Central Subsidy | Typical Payback | 25-Yr Net Gain |
|---|---|---|---|---|
| 2 kW | ~270 kWh | ₹60,000 | ~3.2 Years | ~₹11.8 Lakhs |
| 3 kW | ~405 kWh | ₹78,000 | ~3.3 Years | ~₹17.9 Lakhs |
| 5 kW | ~675 kWh | ₹78,000 | ~3.9 Years | ~₹29.4 Lakhs |
| 10 kW | ~1,350 kWh | ₹78,000 | ~4.2 Years | ~₹59.2 Lakhs |
Engineering FAQs
Do off-grid battery systems qualify for PM Surya Ghar subsidy?
No. Central subsidy applies to grid-interactive rooftop systems (or qualifying grid-tied hybrid architectures approved under state DISCOM guidelines). Pure off-grid systems without net metering do not receive CFA.
Can I install 5 kW or 8 kW and still receive the ₹78,000 subsidy?
Yes. For residential systems above 3 kW, you still receive the full maximum central subsidy of ₹78,000 (subject to your sanctioned electricity load and DISCOM rules).
What solar panels are mandatory for the subsidy?
DCR (Domestic Content Requirement) modules manufactured in India (both cells and modules) listed under MNRE ALMM are mandatory to claim central financial assistance.
Verify These Numbers on Your Own System
Run exact calculations with Solar Buddy Pro or design full A1 SLDs inside SolarPro V2.0.
