Renewix Innovations
Renewix Engineering Journal

Technical Standards, Subsidy Math & Design Guides.

Peer-reviewed field notes, Indian regulatory references (CEA, MNRE, BIS IS:1554, IS 3043), and engineering benchmarks written by Renewix design engineers.

PM Surya Ghar Muft Bijli Yojana (2026): Exact Subsidy Slabs, Sizing & ROI in Gujarat
Policy & Financial EngineeringUpdated 2026-11-15 · 6 min read

PM Surya Ghar Muft Bijli Yojana (2026): Exact Subsidy Slabs, Sizing & ROI in Gujarat

Residential grid-connected rooftop solar systems receive ₹30,000/kW up to 2 kW, ₹18,000 for the 3rd kW, and a hard central cap of ₹78,000 for 3 kW and above. Group housing societies (RWAs) qualify for ₹18,000/kW up to 500 kW for common amenities. In Gujarat (Vadodara/Ahmedabad), a subsidized 3 kW plant typically breaks even in under 3.5 years.

By Pankaj GuptaRead Full Guide
Solar AC & DC Cable Sizing per IS:1554 Part I & IEC 62930: Engineering Rules
Electrical EngineeringUpdated 2026-11-15 · 7 min read

Solar AC & DC Cable Sizing per IS:1554 Part I & IEC 62930: Engineering Rules

Never size solar cables solely on nominal ampacity at 25°C. Indian rooftop installations experience 45°C–55°C ambient and conduit temperatures, requiring thermal/conduit derating, a 1.25× continuous-duty multiplier, and strict <1.5% AC voltage-rise limits to prevent high-voltage inverter nuisance tripping.

By Renewix Electrical Design DeskRead Full Guide
LiFePO4 vs. Sodium-Ion vs. Tubular Lead-Acid Storage for Indian Solar Climates
Energy Storage & BESSUpdated 2026-11-15 · 6 min read

LiFePO4 vs. Sodium-Ion vs. Tubular Lead-Acid Storage for Indian Solar Climates

While Tubular Lead-Acid carries a lower upfront sticker price, its 50% Depth of Discharge and 85% round-trip efficiency require nearly double the nominal kWh nameplate capacity compared to LiFePO4 or Sodium-Ion. Over a 12-year horizon, LiFePO4 & Sodium-Ion deliver lower ₹/kWh cycled energy with zero acid maintenance.

By Renewix BESS R&D GroupRead Full Guide
Designing Compliant Solar Single Line Diagrams (SLD): CEA 2019, IS 3043 & PV-DG Sync
CAD & Grid ComplianceUpdated 2026-11-15 · 7 min read

Designing Compliant Solar Single Line Diagrams (SLD): CEA 2019, IS 3043 & PV-DG Sync

Every commercial or industrial solar approval in India hinges on an accurate electrical SLD proving galvanic isolation, surge suppression (DC & AC SPDs), properly rated ACDB breakers (>=1.25× full-load current), CEA 2019 Class 0.5s/0.2s bi-directional metering, dedicated IS 3043:1987 earthing pits, and reverse-power interlocking if synced with a Diesel Generator.

By Pankaj GuptaRead Full Guide